<p>Client: Macmahon<br />Location: Perth<br />Date: 2010</p>
<p>Construction of two bridge approaches, as well as the bridge abutments, off ramps and the bridges’ themselves over Alexander Drive for the Reid Highway. The works were under taken to alleviate congestion at a well-known trouble spot.</p><p>As well as the concrete construction of the bridge abutments and the bridge decks, placement of precast beams, works also included levels for placement of base course and surfacing, as well as all kerbing and finishing touches such as line marking.</p>

Professional Surveying Solutions to all industries.
Perth | Unit 4, 14 Halley Road, Balcatta WA 6021
Dunsborough | 1A/30 Faure Lane, Dunsborough WA 6281
Weipa | 14 Sunbird Court, Rocky Point QLD 4874
Port Hedland | 7A Yanana Street, Wedgefield WA 6722