FMG T155 Rail Duplication

Client: Abigroup
Location: South Hedland
Date: 2011 -

Duplication of the existing rail line from their car dumper at Boodarie including 4km of loop, and 30km of mainline, and another 15km of mainline duplication at Chapman location. These both included rail formation to sub-ballast capping, rail crossings and construction of culverts. Up to 7 Surveyors on a rotating roster were on this project.

Date

19 September 2016

COM_SPSIMPLEPORTFOLIO_PROJECT_TITLE

FMG T155 Rail Duplication

Categories

Infrastructure
FMG T155 Rail Duplication

logo

Professional Surveying Solutions to all industries.

Perth | Unit 4, 14 Halley Road, Balcatta WA 6021
Dunsborough | 1A/30 Faure Lane, Dunsborough WA 6281
Weipa | 14 Sunbird Court, Rocky Point QLD 4874
Port Hedland | 7A Yanana Street, Wedgefield WA 6722